Monday, 22 June 2015

DURADM Rural and Farming Dam Liner

A dam liner is not that difficult to install and can be done by the handy person with some help. We also have some general guidelines for installing up your dam liner and getting the most out of it, Fabric Solutions Australia can pre-fabricate dam and geomembrane liners up to approximately 3000 sqm as a single sheet.

Fabric Solution's Services:

  • Expert technical advice
  • Design
  • Manufacturing
  • Full installation or installation supervision available
  • National and global delivery options
  • We work closely with our clients to achieve the best solution
Where farm animals or even wild animals make use of the dam, you will take measures to ensure the animals do not damage the liner. There are two basic ways to do this. The most preferable way is to erect a fence around the dam and pump water to a trough. Otherwise the liner should be covered by geotextile and at least 300 mm of gravel whereever an animal can walk in the dam.


EMAIL     = INFO@FABRICSOLUTIONS.COM.AU


MORE DETAIL GO HERE :- DAM REPAIR


No comments:

Post a Comment